111
111
A Chronology of Events During the Gemini Program
SIGNED BY SIX GEMINI ASTRONAUTS
前往
111
A Chronology of Events During the Gemini Program
SIGNED BY SIX GEMINI ASTRONAUTS
前往

拍品詳情

太空漫遊

|
紐約

A Chronology of Events During the Gemini Program
SIGNED BY SIX GEMINI ASTRONAUTS
GRIMWOOD, JAMES M., BARTON HACKER and PETER VORZIMMER. Project Gemini, Technology and Operations, A Chronology. NASA SP-4002. Washington: 1969. XVI, 308 pp. 10 ½ by 8 inches. Original blue cloth. Library of Congress stamp on half title.
參閱狀況報告 參閱狀況報告

相關資料

SIGNED and INSCRIBED on the frontispiece photograph of the Gemini 7 spacecraft after rendezvous with Gemini 6 as: “BUZZ ALDRIN, Gemini XII; GORDON COOPER, GT 5; RICHARD GORDON, GT 11; JAMES LOVELL, GT 7 and GT 12; TOM STAFFORD, Gemini 6, 9; and WALLY SCHIRRA.”

A month by month and nearly day by day chronology of significant Gemini events from April 1959 to February 1967. Contains dozens of photographs, drawings, and diagrams. Seven appendixes include flight summaries, mission objectives, spacecraft data, program costs, and a listing of contractors, subcontractors, and equipment vendors.

太空漫遊

|
紐約